White stucco residential entry with weathered terracotta roof tiles, an oak door, limestone steps and a sculptural olive tree.

La Jolla Village Holiday Events 2026: Girard Avenue Guide

The 70th La Jolla Christmas Parade steps off from Kline Street and Girard Avenue on Sunday, December 6, and heads up Girard toward Prospect. That route covers almost exactly the same ground as the Village Streetscape, the La Jolla Community Foundation's rebuild of Girard. Phase 1 runs from Prospect Street to Wall Street. Phase 2 continues from Wall to Silverado.

Phase 1 is fully funded. The permit was issued in August, and organizers have said work will begin in the early part of 2027. That puts this year's Holiday Open House and parade on a Girard Avenue that will likely look different by next December. It's worth walking the street this season with that in mind.

The Parade Route Is Also the Construction Map

The official 2026 event map labels Girard Avenue as the parade route. Along the way it marks Warwick's, the Athenaeum and the Grande Colonial. The parade ends at the La Jolla Recreation Center at Draper Avenue and Prospect Street, where the Holiday Festival runs from 1 to 5 p.m.

Heading north from Kline, floats and marching bands pass Silverado, then Wall, then reach Prospect. That's the Phase 2 block followed by the Phase 1 block, in the same order the Foundation plans to build them. The sidewalks people stand on to watch are the sidewalks the project will rebuild.

What the Rebuild Puts on Those Blocks

The San Diego Union-Tribune reported on October 20 that the full project adds the following across both phases:

  • 63 new benches
  • 49 new trees
  • 51 new lights
  • 9,100 square feet of new public space
  • Curb extensions and traffic-calming measures

The project has been estimated at $7.43 million. At the October 14 La Jolla Village Merchants Association meeting, Foundation executive director Lidia Rossner said it is "now, it's closer to $8 (million)." She said the most expensive piece is the stormwater drainage channels, which she called especially important with El Niño season coming. Some elements were cut from the plans along the way, including an on-ground mural.

The start date has slipped before. Construction was once expected to start in August. Then a federal grant of $850,000 from the Department of Housing and Urban Development came with different bidding rules than the state grant, so the project had to go out to bid again. At the merchants meeting, Rossner put it this way, as the Union-Tribune reported:

"In theory, it is possible that we start sometime in January, but we don't know."

At the next day's Enhance La Jolla meeting, Foundation chairwoman Phyllis Pfeiffer said work would begin "in the early part of 2027." She called the timeline "like a moving goal post." The Foundation's project page says it will announce a construction timeline by December 2026.

Merchants have also raised concerns. LJVMA executive director Jodi Rudick told the meeting that some merchants expect "major construction" and "loss of parking." She also said "it's going to be a really beautiful project."

November 22 Is the Day to Walk Those Blocks

Two weeks before the parade, the La Jolla Village Holiday Open House returns on Sunday, November 22, from 11 a.m. to 4 p.m. Adelaide's started it more than 40 years ago. The merchants association says there's no central festival. Instead, businesses across the Village put on a day of shopping, dining, music, treats and activities. Each participating business hosts its own festivities. The association suggested ideas like live music, treats, promotions, children's crafts and photo spots.

A few Girard storefronts will be having their first holiday season. The Union-Tribune's September business roundup covered these openings:

  • La Jolla Perfume & Cologne at 7606 Girard Ave. had a soft opening August 1.
  • Mahj Theory Collective opened August 12 at 7863 Girard Ave., with Mahjong lessons, open play and memberships.

Whichever schedule the streetscape keeps, both businesses opened on a Girard that has its old lighting, old benches and current curbs. The Open House is an easy afternoon to see that version of the street before it changes.

December 6, Start to Finish

Here's how the day lines up, using the organizer's site and map:

  1. Check the tow-away map before you park. The organizer posts a separate No Parking and Tow Away Zones map next to the event map. Residents on or near the route should look at it before Sunday morning.
  2. The Holiday Festival opens at 1 p.m. at the La Jolla Recreation Center and runs until 5 p.m.
  3. The parade starts in the early afternoon at Kline and Girard. The organizer's site lists the exact kickoff time.
  4. The route ends at Draper and Prospect, right at the festival grounds.

The festival will have better access than it did a few weeks ago. After a crash at the Recreation Center on October 13, the damaged pillar was removed and the fencing replaced, which reopened the nearby sidewalk and playground. The city has no timeline or cost estimate yet for a new pillar.

Getting Into the Village After Dark Runs on Its Own Schedule

The parade is on a Sunday afternoon. On the city's posted schedule, Sunday evening is also when the weekly overnight lane closures on Torrey Pines Road begin. In an October 6 update, the La Jolla Shores Association said the guardrail project between Prospect Street and Coast Walk was expected to start on or about October 12. The posted plan calls for lane closures from 7 p.m. to 3 a.m., Sunday through Thursday, through March 2027. Turn lanes, sidewalks and bike lanes will also be affected at times during the day. If the work keeps to that plan, drivers heading home toward the Shores after a Sunday-through-Thursday dinner in the Village in December could hit those closures.

There's also a new option this season. La Jolla Light reported that Waymo expanded its service to La Jolla, Clairemont and University City, with broader availability starting October 14. Rides are booked through the Waymo app.

If dinner is in the Shores, Shio is the newest table. It comes from Eugene and Peter Kim, the owners of Takaramono, and took over the former Sandpiper and Galaxy Taco space on Avenida de la Playa. Its grand opening was October 24, per La Jolla Light.

The Coast Changes Too, on December 15

The coastline has its own calendar this winter. The Children's Pool beach closes to the public every year from December 15 through May 15 for harbor seal pupping season, according to the City of San Diego's lifeguard page. That leaves the first two weeks of December to walk down to that beach before the closure.

A short walk away, Scripps Park opened its second picnic grove on October 23. It sits on the park's western side and has two tables, a charcoal grill, GraniteCrete paving and trash cans. On Coast Walk Trail, the La Jolla Coastal Conservancy added berm and runoff improvements and rock-filled gabions ahead of winter storms. Along Coast Boulevard, Scouts started a prototype repair of the aging fence between Goldfish Point and La Jolla Cove, and the Conservancy is aiming to finish that fence work by the end of the year.

Questions about how the streetscape could affect Girard Avenue properties over the next year? That covers storefront visibility, parking and how a block reads to buyers during construction and after. Christopher Burgos and the team follow these Village projects closely and can talk through what they mean for a sale or purchase. Schedule a Consultation, and we'll go over the timeline with you.

Work With Us

Our dedicated and trustworthy team has earned the honor of being a BiggerPockets, Zillow, and Realtor.com Premier Agent and always has our clients’ best interests in mind, and is an exceptional asset to Coldwell Banker® West!

Follow Me on Instagram